How cesspool replacement works in Suffolk
- 1
Get your estimate
You, a few minutes
Fill out the online form and see a preliminary estimate right away.
- 2
Site visit and paperwork
You + your grant coordinator
We confirm your address is eligible, visit the property and give you a firm price. You send a few documents and sign the contract and the county's payment form.
- 3
Design
Design engineer
An engineer takes a soil boring and designs a system sized for your home.
- 4
Grant applications
Your grant coordinator
We file the county and state applications and follow them through. Once you're awarded, you have 30 days to sign the acceptance packet.
- 5
Approval and installation
Health department + our crew
The health department approves the design, then our crew installs the new system and fills in the old cesspool. The work usually takes a few days.
- 6
Inspection and payment
Suffolk County
The county inspects the system and pays both grants directly to us. You pay only your share.
Where everything goes on your lot
The new tank sits near the house and the leaching pool goes where the soil and setbacks allow. The engineer works out the exact layout from your survey and the soil boring.
Find out what you'd pay
Answer a few questions about your home and see an estimate right away. No cost, no obligation.